SPRINGSTEP INSTALLATION
SPRINGSTEP IV, A, B, C
Installation Instructions
Springstep IV has a hardwood veneered surface used only for permanent glue down projects. It is available with all foam applications, and installs exactly the same way as other Springstep IV configurations.
Foam forms and Springstep IV panels may ship separately.
Pre-assembled Springstep IV is ready for installation. See image #1
- Peel adhesive paper off of "L"'s and square shaped foam forms and 3" blocks and apply in pattern and illustrated to the rough side of the board. See image #2.
- After affixing foam pieces, flip boards over so that the smooth side is facing up. Starting in one corner with a full board, work left to right across the room cutting the last board if necessary to fit your width.
- Press boards into each other making sure to stagger seams. See image #3.
- Every other row should begin with a full board. Rows should alternate starting with full boards and half boards as illustrated.
- Leave 1/2" gap at walls to allow air to circulate and floor to move.
- Floor is complete when you reach the walls or the desired size.
- Transition pieces, corners and edging are available.
Note: A vapor barrier over your slab is required with all subfloors.
For increased absorption of energy and a bit less spring, use SSIV-C. Follow steps above using 3" blocks only in the pattern shown in image #4.
Foam Cube Layout
Springstep IV-B (for increased resiliency)*
- Attach foam blocks in the pattern with liquid nail or contact adhesive, or use our new peel and stick design. (See image #1.)
TIP: Use spray contact adhesive to speed assembly, or use our new peel and stick design.
NOTE: 2" foam blocks will provide greater resilience and more "spring" for high impact activities. It will also amplify sound better. - After affixing foam blocks, invert panel to look like photo to the right.
- Press boards into each other making sure to stagger seams. See image #2 and #3.
The average two-person crew can complete 100-125 sq. ft. per hour, 800-1,000 sq. ft. per day. - Leave 1/2" gap at walls for air circulation.
Floor is complete when you reach walls or your desired size.
Springstep IV-A (for firm floor and sound reduction) Springstep is also available with 1/2" foam sheeting. Foam is loose laid over vapor barrier and Springstep IV panels are installed in the same pattern shown in image 2 and 3.
*Resiliency is the measurement of "spring". Increased resiliency = more "spring". Less resiliency = more firm. Shock absorption of all SSIV products is virtually the same and will help prevent dance and sport related impact injuries.
The use of Stagestep Vapor Barrier 8mil or 12mil or better plastic barrier, is mandatory when installing Stagestep products over, above, on, or below grade concrete. Failure to do so will void all warranties.
