TEMPORARY INSTALLATION
- Before taping, unroll flooring and allow to sit on subfloor until flooring lies flat and acclimates to room temperature. Letting the floor sit overnight or longer would be ideal. Floor must lie flat before taping. Leave 1/16" gap at all seams and 1/2" gap at walls.
- Tape all seams and circumference of the room using 1-1/2" or 2" vinyl or cloth tape.
- Floor must be installed over a clean, smooth, level, and dry surface.
